Project 962-3 - Dubele

Dubele, Dubele

Hydropower

r634_9_962-3_hpp_dubele-2.jpg

Design, manufacturing, installation and commissioning of 3 Kaplan turbines (Kaplan horizontal pit double regulated) of 5.05 MW each.

Project activities

Main company

HPP

Activities

Equipment manufacturer

Project Information
Detail of the equipment used

Turbines, generators, speed increasers, control desk/master control and SCADA system, Local distrib, DC back-up system, oil step up transformers, 11kV switchgear

Installed power (specify unit KW, MW or other)

10 100

Annual produced energy (specify unit MWh or other)

Nc

Grid connection

On grid

Project cost (in euros)

Nc

Project progress

Contract signed
Work in progress
In operation
Employees mobilized
  • -

    Locals employees

  • -

    Employees for the development phase

  • -

    Employees for the construction phase

  • -

    Employees for maintenance