Project

Mwadingusha Hydro Power Plant rehabilitation project

Likasi, Democratic Republic of Congo

Hydropower

Centrale hydro-électrique de Mwadingusha (République Démocratique du Congo)

Rehabilitation project of Mwadingusha hydro-electric power plant, belonging to SNEL, in partnership with Andritz Switzerland. The project, financed by the mining group Ivanhoé, includes the rehabilitation of 6 x 12 MW Francis turbines and the associated generators, as well as the whole electrical and mechanical auxiliaries of the plant.

Project activities

Main company

Omexom Hydro

Activities

Construction

Type of implantation in the country
Subsidary
Project Information
Detail of the equipment used

3D survey and engineering, cooling, drainage and dewatering systems, fire detection and protection, power block upto main transformers, MV and LV distribution, control and protection systems.

Installed power (specify unit KW, MW or other)

72 MW

Annual produced energy (specify unit MWh or other)

-

Grid connection

On grid

Main fundings

Debt

Project cost (in euros)

50 Millions €

Year of entry into service

2019

Project progress

Contract signed
Work in progress
In operation
Employees mobilized
  • 50

    Locals employees

  • -

    Employees for the development phase

  • 70

    Employees for the construction phase

  • 25

    Employees for maintenance

Main company

Omexom Hydro

  • Waste recovery , Onshore , Photovoltaic solar , Heat pumps , Hydropower
  • Construction
Main non-french partners

Andritz Hydro Suisse

The project photo gallery